How to fix paddock grid?
- Share
- Issue Time
- Apr 1,2019
Step 1: Remove the topsoil in the problem area to a depth of six to eight inches.
Paddock grid systems are designed to provide a stable base for the footing material while facilitating drainage of rainwater – functions which help minimize the occurrence of muddy paddock footing. Photo: Clients from Leiyuan Industrial Company.
Step 2: Lay down a layer of geotextile fabric (sometimes called filter fabric or landscape cloth), followed by three to four inches of 1.5 to 1.75-inch crushed stone, topped by another layer of geotextile fabric.
Step 3: Cover the geotextile fabric, making sure the edges are securely buried, with a minimum of six inches of the footing material of your choice.